Day 7
Because of the timing
between epoxy layers, the floor had to be re-sanded using micro pads so
the next layers would bond properly. After the sanding, the
remaining diamond striping was mapped out and coated using Ellis Maximus black epoxy. Along with the diamond
coating, the outside
black border was also coated. |
|
|
|
|